Trunk Sewer, Baghdad
The company had ventured into overseas market with the construction of Trunk Sewer 2.0 to 2.4 m. diameter and 10.5 km long and subsequently turnkey construction of a sewerage network in Baghdad including 26 Pump Stations.

Principal Quantities of Work  
Excavation (Using well point system & sheet piling) 4,00,000 cubic meters
Concrete with Slipform Shuttering 40,000 cubic meters
Earth Fill 1,75,000 cubic meters
Main Sewers 560 Km
House laterals & Gullies 350 Km
Manholes 12,000 Nos.
Ventilating 1,000 Nos.
Street Inlets 10,000 Nos.

Pumping Stations incl. design, erection & commissioning of electro – mechanical equipment

26 Nos.
Sidewalks 1,200 Km
Excavation 15,00,000 cum
Concrete 2,40,000 cum
Aggregates in sub – base 8,00,000 cum
Earthfill 5,00,000 cum