| Karjan Concrete Gravity Dam |
![]() |
| The Karjan Concrete Gravity Dam was built for the Karjan Reservoir Project in Gujarat. Over 46,000 cum of chilled concrete was placed in a single month. The concrete was placed by tower cranes. The project was completed six months ahead of schedule. |
| Principal Quantities of work | |
| Crest Length | 900 M with Masonry |
| Height | 100 M |
| Volume of Chilled Concrete to be Placed | About 1 million cum. |
| Excavation (rock) | 210,000 cubic meters |
| Chilled Concrete | 1,029,000 cubic meters |
| Masonry | 90,000 cubic meters |
| Drilling | 27,885 M |
| Grouting | 12,200 bags |